Short answer: Lead time is 30–40 days from order confirmation to dispatch. Our current wholesale line sheet covers 40 models of modular compressed seating — sofas, sectionals, loveseats, chairs, and ottomans. Pricing, MOQ, and logistics are covered in our quotation sheet. Email [email protected] or use the inquiry form below.
The numbers we publish — and most suppliers don't
| Metric | Verified Production Figure |
|---|---|
| Container loading | A 40-foot high-cube holds a median of 234 units of our configurations |
| Compression ratio | Median configuration ships 5.6× smaller than assembled (56 ft³ → 10 ft³); range 2.5×–11.0× |
| Cartons per unit | 53% ship in a single carton, another 22% in two |
| Carton size | 93% of cartons have a second-longest edge of 30 inches or less |
| Gross weight | Median configuration 95 lb split across cartons; single seats median 44 lb |
Construction standards we build to
We source our polyurethane foam from East Asia Sponge and specify it by density rather than by price. Load-bearing armrests and seat cushions are moulded as single solid pieces — never scrap-foam offcuts mixed with loose fiber fill. Removable covers are standard across the line.